Bukit Bintang City Centre (BBCC)

BUKIT BINTANG CITY CENTRE

Expected 2020 – Kuala Lumpur
Mix Development

A one million sq. ft. retail mall will provide all the needs of modern shopping with specialised and eclectic brands complementing exciting al-fresco eateries.

A mix of local and international retailers will elevate this shopping experience to a new level. The lifestyle street concourse will encapsulate shopping, eateries, and entertainment for social gatherings that both residents and guests can enjoy. In the podium block, an entertainment hub features a world-class Zepp music hall, a cineplex, and a Malaysia Grand Bazaar that showcases local heritage crafts and fresh contemporary works. Adjacent blocks include a hotel, strata offices, and serviced apartments, while BBCC’s Signature Tower will be an 80-storey icon that makes it mark on KL’s city skyline. Green lungs are threaded into BBCC’s design to ensure biodiversity and environmental sustainability, and a central transit hub connecting the existing Hang Tuah monorail, the LRT as well as linkage to the upcoming Merdeka MRT station will link BBCC to all parts of Kuala Lumpur and beyond.

Location:
Intersection of Jalan Hang Tuah and Jalan Pudu

Site Size:
19.39 acres

Built-up Area:
11,465,889 sq ft

No. of Units/ Building Storeys:
Parcel 1
Retail Mall – 7 levels
Signature Tower – 80 storeys, 4 level retail,
24 level offices, 18 level hotel (308 rooms),
33 levels Serviced Apt (108 units)

Parcel 2
Entertainment Hub – 8 levels incl Zepp Music Hall,
2 levels Malaysian Grand Bazaar, 2 levels cineplex,
1 level Banquet Hall
Strata Office 1 – 43 levels
Hotel – 27 levels (359 rooms)

Parcel 3
8 level podium carpark with 1 level retail
Serviced Apt 1 – 47 levels 393 units
Serviced Apt 2 – 35 levels 273 units

Parcel 4
8 level podium carpark with 1 level retail
Serviced Apt 3 – 65 levels 587 units
Serviced Apt 4 – 39 levels 312 units

Parcel 5
Serviced Apt 5 – 52 levels 442 units
Strata Office 2 – 26 levels with 4 level podium
incl 1 level retail & 2 level surau
Transit Hub
Integrate existing Hang Tuah LRT &
Monorail stations to BBCC

No. of Car Parks:
Parcel 1: 3532, Parcel 2: 1039, Parcel 3: 912
Parcel 4: 1292, Parcel 5: 344
Total: 7119

RECENT WORKS